Roboty żelbetowe, poziom 0 i -1 -a

20.12.2018

Ferro-concrete works, level 0 and -1


News

29.07.2019

Installation works on the roof of the Giant Office building.

02.08.2019

Steel structure on the 7th floor of the Giant Office office building