giant-office-budowa-06-10-2018-wylewanie-stropu-zel-betonowego-na-poziomie-1

06.10.2018

Pouring a gel-concrete floor at level one


News

29.07.2019

Installation works on the roof of the Giant Office building.

02.08.2019

Steel structure on the 7th floor of the Giant Office office building